Working conventions for working on GHC

GHC is a BSD-licensed open-source project, and we welcome your help in making it better. This page has pointers to information you'll need.

First, make sure you are familiar with GHC's Licensing. Unless you say otherwise, we will assume that if you submit a contribution to GHC, then you intend to supply it to us under the same license as the existing code.

These pages guide you step-by-step through making a contribution:

Coding conventions

When you are editing GHC's source code, please follow our coding guidelines:

Validating patches and the test suite

Before you commit a patch you want to be reasonably sure you haven't broken anything. So before you commit, you must validate your changes, using the regression test suite:

  • The policy on validating patches, and how to perform validation, is at: TestingPatches.
  • Details about the regression test suite, and how to use it are at: Building/RunningTests

Using Darcs

Our conventions and some useful tips for using darcs are here: WorkingConventions/Darcs.

The Bug Tracker

We organise our work (both bug fixing and feature requests) using the Trac bug tracker. There are links to the bug tracker in the sidebar under "View tickets" and "Create ticket". See also:

Type and status

Every ticket has a status and a type, which appear in the title of the ticket. Thus "Ticket #2762 (new bug)" means status=new, and type=bug. Here's what they mean:

  • Type is one of bug, feature request, task, or proposal. We don't use proposal much.
  • Status says what state the ticket is in. It is one of these:
    • New means what it says.
    • Infoneeded means that the ticket is stalled awaiting information from the submitter (or anyone else).
    • Closed means what it says.
    • Merge means that a fix has been committed to the HEAD, but should be propagated to the current release branch.
    • Patch means that the ticket includes a patch for review. We love patches! So we try hard to review patches promptly and either commit them, or start a conversation with the author.

The intention is that tickets do not live in the Merge or Patch state for long.

Other Trac ticket fields

Each ticket has a bunch of other fields too:

  • Milestone: this field is for the GHC development team to indicate by when we intend to fix the bug. We have a milestone for each planned release (e.g. "6.12.3"), and three special milestones:
    • An empty milestone field means the bug has not been triaged yet. We don't yet know if the ticket is a real, unique, issue. Once this has been established, the ticket will be given a milestone.
    • Not GHC is for tickets that are not tied to a GHC release.
    • _|_ is for tickets that have been triaged, but we don't plan to fix them for a particular release. This might be because the bug is low priority, or is simply too hard to fix right now.
  • Severity: this is set by the submitter of the ticket, and indicates how important the issue is to them, i.e. is it preventing them from doing something altogether, or just a minor annoyance. The severity might be reduced if we discover a workaround.
  • Priority: this field is for the GHC development team to help us prioritise what we work on. On a release milestone, the highest priority tickets are blockers for that release, and the high priority tickets are those that we also plan to fix before releasing. We will also try to fix as many of the normal and lower priority tickets as possible.
  • Test Case: fill in this field with the name of the test in the test suite. Typically every bug closed should have an appropriate test case added to the test suite.
  • cc: we pay more attention to tickets with a long cc list, so add yourself to the cc list if you care about the ticket. Better still, add a comment to explain why you care.

Releases

When a release is made, any open tickets on that release's milestone will be moved to the next release's milestone. However, if they are more than 1 major release old (e.g. opened on the 6.10 branch, and about to be moved to the 6.14.1 milestone), and there is not a reason to keep them in the release milestone (e.g. a patch attached for review, or significant support in the CC field), then they will be moved to the _|_ milestone instead.

Workflow

The ticket workflow is illustrated in the following image. Most tickets will start in state "new" and, once fixed, possibly go via state "merge" if they are suitable for merging to the stable branch, before moving to state "closed". They may also go via state "infoneeded" if more information is needed from the submitter, or "patch" if a patch that needs review has been attached to the ticket.

No image "workflow.png" attached to WorkingConventions