Changes between Version 69 and Version 70 of Status/GHC-7.8


Ignore:
Timestamp:
Oct 7, 2013 6:04:10 PM (6 months ago)
Author:
hvr
Comment:

point to latest release schedule

Legend:

Unmodified
Added
Removed
Modified
  • Status/GHC-7.8

    v69 v70  
    33== Timeline == 
    44 
    5 The planned timeline for 7.8 is to have a feature freeze approximately at the time of ICFP, followed by a period of frantic bugfixing. A release candidate (and the 7.8 branch) will be formed after this, likely sometime in October. 
     5~~The planned timeline for 7.8 is to have a feature freeze approximately at the time of ICFP, followed by a period of frantic bugfixing. A release candidate (and the 7.8 branch) will be formed after this, likely sometime in October.~~ 
     6 
     7See recent ghc-devs posting [http://permalink.gmane.org/gmane.comp.lang.haskell.ghc.devel/2569 GHC 7.8 Release Status & Schedule] for latest timeline. 
    68 